Federal Project

Holloman Air Force Base Aircraft Training Facility

DEPARTMENT OF THE ARMY

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
DEPARTMENT OF THE ARMY
2018
CONTROL/SAFETY TOWER
REDESIGN

New Title

New Title

Holloman Air Force Base Aircraft Training Facility

This project consists of the redesign, removal, and replacement of the Control/Safety Tower. The basic design consisted of a sealed three-layer system of two 80-mil HDPE ­exible membrane liners (FML) separated by interior drainage. Removed and stored the Engine Debris Fire Trainer, mounted over a ground burner at the left front of the aircraft mock-up. 


  • Scope of Work

    This project consists of the redesign, removal and replacement of the Control/Safety Tower, design, alterations/renovations and repairs of the LP fuel, water, air, and nitrogen systems; repair or replacement of the ground burners, airframe burners, and igniter system; installation of a new 480-volt 3-phase electrical system and repair or replacement of all switches and controls including the Control Panel; repairs and upgrades to the LPG tank system; replacement of the High Density Polyethylene (HDPE) liners for the burn pit and water conservation pond; and replacement of the cathodic protection system. Remove the aircraft mock-up from burn area and stored in a protected area while performing the site work for this project. Remove pipe supports from burn pit if needed to support the mock-up while in storage. Also remove and store the Engine Debris Fire Trainer, mounted over a ground burner at the left front of the aircraft mock-up. Install new HDPE liner system. The basic design consists of a sealed three layer system of two 80-mil HDPE ­exible membrane liners (FML) separated by an interior drainage ­ow net (National Seal Company Poly-Net 3000 or equal). The system continues downward and beyond the burn area structure to the end of the pipe trench to function as a collection system to accumulate, detect, and permit removal of any leaked ­uids. FMLs should not to be used as a structural component.

YOU MIGHT ALSO BE INTERESTED IN....

Share by: