Education Project

BP14 – Lancaster & Le Barron Park ES Additions and Renovations

BP14 – Lancaster & Le Barron Park ES Additions and Renovations


Contract Number: Bond-16-CSP
Contract Award: September 14, 2017
Contract Value: $7,808,000.00
Completion Date: 03/01/2019
List of Key Personnel: Project Manager, Project Engineer, Site Superintendent, Site Safety and Health Officer
List of Major Subs/Trades: Demolition
Aztec Contractors, Inc. served as the Prime Contractor the new construction of two new 13,819-SF multi-purpose buildings totaling 27,638 SF. One building is constructed as the Lancaster ES and one at the Le Barron ES. Each building features a state-of-the art kitchen, cafetorium, teacher’s lounge, stage, and support facilities. The scope of work at these two facilities includes steel columns, metal stud walls with EIFS, metal panels, demolition, earthwork, exterior improvements, utilities, metals, woods, plastics, composites, thermal and moisture protection, openings, finishing, specialties, equipment, mechanical, electrical, and plumbing systems. Work includes concrete footings, concrete tilt-up walls, slab on grade, steel joists, texture wall paint, single ply roofing membrane, and exterior covered areas. Interior work at both Elementary schools include painted gypsum wall board metal stud, acoustical lay-in ceiling tile V.C.T. flooring with rubber base ceramic title wall wainscot, quarry tile flooring in kitchen with ceramic tile walls vinyl faced ceiling kitchen, stainless steel commercial type kitchen equipment, and a permanent stage with curtain. Exterior work includes site demolition, earthwork, concrete walkways, landscaping, irrigation, decorative rockwalls, and interior lighting.

YOU MIGHT ALSO LIKE
PLEASE SHARE THIS
Share by: