Education Project

EPISD Austin H.S., Irvin H.S., & Terrace Hills Middle School Portable Classroom Building Village

EPISD Austin H.S., Irvin H.S., & Terrace Hills Middle School Portable Classroom Building Village


Contract Number: 17-7261
Contract Award: July 19, 2018
Contract Amount: $1,075,708.40
Completion Date: Pending
List of Key Personnel: Project Manager, Project Engineer, Site Superintendent, Site Safety and Health Officer
List of Major Trades: Concrete, Earthwork, HVAC, Transportation

Project Description:


Aztec serves as the Prime Contractor on this school district project for The El Paso Independent School District in three different school locations. The scope of work includes the following:

Austin High School Portable Classroom Building Village: Building electrical service to supply 13 portable classroom building, extend electrical service to building to include installation of any power poles, install ADA ramps, steps, and skirting at all buildings, install two-way public address system to all buildings connect fire alarm system from each building to the main fire alarm panel, inspect fire alarm connections, provide two IT connection drops to each building and obtain all building permits.

Irvin High School: Building electrical service to supply 10 portable classroom building, extend electrical service to building to include installation of any power poles, install ADA ramps, steps, and skirting at all buildings, install two-way public address system to all buildings connect fire alarm system from each building to the main fire alarm panel, inspect fire alarm connections, provide two IT connection drops to each building and obtain all building permits. Terrace Middle School: Building electrical service to supply 15 portable classroom building, extend electrical service to building to include installation of any power poles, install ADA ramps, steps, and skirting at all buildings, install two-way public address system to all buildings connect fire alarm system from each building to the main fire alarm panel, inspect fire alarm connections, provide two IT connection drops to each building and obtain all building permits. Aztec works closely with EPISD & JACOBS throughout the progress of this project. We coordinate with the local El Paso government authorities to obtain local approvals, permits and other documents required for this project.