Education Project

Dr. Joseph E. Torres Elementary School 

Dr. Joseph E. Torres Elementary School 


Contract Number: 17-612
Contract Award: October 23, 2018
Contract Amount: $16,970,388.40
Completion Date: July 12, 2020
List of Key Personnel: Project Manager, Project Engineer, Site Superintendent, Site Safety and Health Officer
List of Major Trades: Demolition, Roofing, Concrete, Mechanical, Electrical, Plumbing

Aztec served as the Prime Contractor on this school district project for The El Paso Independent School District for the consolidation of Bradley Elementary School and Fannin Elementary School to be rededicated as Dr. Joseph E. Torres Elementary School.


The consolidation consists of a total of 54,075 square feet. The scope of work includes but it is not limited to: demolition of existing facilities to include utility demolition, site demolition, site clearing and grubbing. Grading, excavation, lime soil stabilization, storm sewer, stormwater gravity piping, aggregate base courses, fog seal, paving, painting, riprap, landscaping, irrigation systems, planting, tree preservation and clearing, chain link fences and gates, decorative metal fences and gates, concrete, masonry, steel, steel erection, architectural wood casework, insulation, roofing, aluminum framed storefronts, door hardware & repair, wall coverings, suspended shaped acoustical ceiling, linear metal ceilings, sound absorbing wall units, flooring, tile carpeting, restrooms, cabinets, fire protection specialties, appliances, gymnasium equipment, playgrounds, furniture, windows, plumbing, HVAC, sanitary sewer and electrical.