El Paso Intelligence Center (EPIC) Roof Replacement Project

US Army Corps of Engineers

  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
  • Slide title

    Write your caption here
    Button
US Army Corps of Engineers
2015
88,000 SQ.FT.
ROOF REPLACEMENT

New Title

New Title

El Paso Intelligence Center (EPIC) Roof Replacement Project

The E.P.I.C. facility roofing project demolished, removed, and replaced approximately 88,000 Sq. Ft. of an existing rubber membrane (EPDM) roof system over an occupied and functioning federal facility. This was achieved by strict scheduling and coordination with the sub-contractors, users, and involved officials. 


  • Scope of Work

    The project included the scheduled shutdown, startup, removal, and relocation of several pieces of existing rooftop equipment, HVAC units, boiler penthouse package, and several water and gas lines. This was performed while simultaneously installing the new TPO roof, retrofitting roof drains and metal cap system, lightning protection system, new rooftop access ladders, and repairing all damaged insulation for the existing piping.